G Deck: Difference between revisions
Ayjayaredii (talk | contribs) m Updated with page intro |
|||
| (2 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
'''G Deck''' is the seventh deck from the top of the [[Magellan Class|Magellan class]] starship and represents one of the lower engineering levels. It houses essential control and support systems, including the main Reactor Control Room, additional cryogenic storage, and the reactor start capacitors. G Deck is primarily accessed from [[F Deck]] via the [[Reactor Room]], [[Cryogenic Storage]] and maintenance tunnels. In future updates, it will connect to the ship's keel fin decks. | |||
==Layout== | ==Layout== | ||
| Line 6: | Line 6: | ||
circle 1919 1025 264 [[Reactor Room]] | circle 1919 1025 264 [[Reactor Room]] | ||
</imagemap> | </imagemap> | ||
As a lower engineering deck, G Deck's layout is centred around supporting the main reactor located on the deck above and housing other large-scale power systems. The arrangement prioritizes functionality and secure housing for critical components | As a lower engineering deck, G Deck's layout is centred around supporting the main reactor located on the deck above and housing other large-scale power systems. The arrangement prioritizes functionality and secure housing for critical components such as the Reactor Control Room and start capacitors. | ||
===Engineering Control Room=== | ===Engineering Control Room=== | ||
This crucial facility is the main control centre for monitoring and remotely managing the ship's [[Fusion Reactor|main reactor]] and other engineering systems. Engineers work here to oversee power generation, manage reactor performance, and respond to any anomalies. Remote control of electrical, life support, fuel, and damage control systems is managed here. In the event the main [[bridge]] | This crucial facility is the main control centre for monitoring and remotely managing the ship's [[Fusion Reactor|main reactor]] and other engineering systems. Engineers work here to oversee power generation, manage reactor performance, and respond to any anomalies. Remote control of electrical, life support, fuel, and damage control systems is managed here. In the event that the main [[bridge]] becomes inoperable, this room serves as auxillary control. | ||
===Cryogenic Storage=== | ===Cryogenic Storage=== | ||
G Deck has the lower deck of the [[Cryogenic Storage]] facility, containing two tanks of | G Deck has the lower deck of the [[Cryogenic Storage]] facility, containing two tanks of deuterium, one tank of helium-3, and one tank of helium. | ||
===Start Capacitors=== | ===Start Capacitors=== | ||
Large banks of capacitors are housed on G Deck. These are | Large banks of capacitors are housed on G Deck. These are used to deliver the massive initial energy pulse required to initiate the fusion reaction within the main reactor upon start-up. They may also be used for continuous operation of the reactor, or other capacitors may be incorporated directly into the reactor itself. | ||
===Life Support=== | ===Life Support=== | ||
| Line 21: | Line 21: | ||
===Corridors and Access=== | ===Corridors and Access=== | ||
Functional corridors connect the Reactor Control Room, cryogenic storage, capacitor banks, and vertical transport (stairs/lift). Access is | Functional corridors connect the Reactor Control Room, cryogenic storage, capacitor banks, and vertical transport (stairs/lift). Access is more restricted than on upper decks, focussing on secure routes for engineering personnel. | ||
{{Decks}} | {{Decks}} | ||
[[Category:Magellan Decks]] | [[Category:Magellan Decks]] | ||
Latest revision as of 03:14, 7 April 2026
G Deck is the seventh deck from the top of the Magellan class starship and represents one of the lower engineering levels. It houses essential control and support systems, including the main Reactor Control Room, additional cryogenic storage, and the reactor start capacitors. G Deck is primarily accessed from F Deck via the Reactor Room, Cryogenic Storage and maintenance tunnels. In future updates, it will connect to the ship's keel fin decks.
Layout

As a lower engineering deck, G Deck's layout is centred around supporting the main reactor located on the deck above and housing other large-scale power systems. The arrangement prioritizes functionality and secure housing for critical components such as the Reactor Control Room and start capacitors.
Engineering Control Room
This crucial facility is the main control centre for monitoring and remotely managing the ship's main reactor and other engineering systems. Engineers work here to oversee power generation, manage reactor performance, and respond to any anomalies. Remote control of electrical, life support, fuel, and damage control systems is managed here. In the event that the main bridge becomes inoperable, this room serves as auxillary control.
Cryogenic Storage
G Deck has the lower deck of the Cryogenic Storage facility, containing two tanks of deuterium, one tank of helium-3, and one tank of helium.
Start Capacitors
Large banks of capacitors are housed on G Deck. These are used to deliver the massive initial energy pulse required to initiate the fusion reaction within the main reactor upon start-up. They may also be used for continuous operation of the reactor, or other capacitors may be incorporated directly into the reactor itself.
Life Support
This room houses the machinery for pumping, processing, storing, and distributing water and air. Details are yet to be worked out.
Corridors and Access
Functional corridors connect the Reactor Control Room, cryogenic storage, capacitor banks, and vertical transport (stairs/lift). Access is more restricted than on upper decks, focussing on secure routes for engineering personnel.
| Magellan Class Decks | |||||||
|---|---|---|---|---|---|---|---|
| A Deck | B Deck | C Deck | D Deck | E Deck | F Deck | G Deck | |